FERC is preparing an Environmental Assessment for the BOG Compressor Project, proposed by Distrigas of Massachusetts LLC under Section 3 of the Natural Gas Act (Docket No. CP25-207-000). The project would install a redundant 500-hp electric-driven boil-off gas compressor and associated piping, HVAC, and electrical systems within the existing liquefied natural gas storage system fenceline. The EA is scheduled for issuance on June 27, 2025, with a 90-day federal authorization decision deadline of September 25, 2025.1 No alternatives count or impact analysis is provided in this scheduling notice.2