FERC staff has prepared an environmental assessment (EA) for the Gabbs Lateral Naval Air Station Fallon (NASF) Relocation Project, proposed by Great Basin Gas Transmission Company (Docket No. CP25-551-000). Great Basin seeks authorization to relocate a portion of its existing Gabbs Lateral pipeline in Mineral and Nye Counties, Nevada, driven by planned expansion of the NASF training range complex. The project involves installing approximately 32.6 miles of new 8-inch and 6-inch pipeline and abandoning approximately 21.2 miles of existing pipeline. The EA concludes no major federal action significantly affecting the human environment would result. Comments are due April 13, 2026.12