FERC staff prepared an environmental assessment (EA) for the Kosciusko Compressor Station Replacement Project in Attala County, Mississippi, under docket CP26-24-000. The applicant, Texas Eastern Transmission, LP, proposes to abandon by removal 14 reciprocating compressor units (five 2,500-horsepower Cooper Bessemer GMW series and nine 2,500-horsepower Cooper Bessemer GMWA series) and install three new natural gas turbine units, comprising one 20,500-horsepower Solar Titan 130 and two 11,110-horsepower Solar Taurus 70 units, along with associated enclosures and electrical buildings. The stated purpose is to maintain safe and reliable station operation while satisfying current air emissions requirements. FERC concludes that approval would not constitute a major federal action significantly affecting the quality of the human environment. The document available here is a Federal Register notice of EA availability, not the full EA text, so detailed impact tables are not present in this excerpt.1