This is a prior notice filing by Columbia Gas Transmission, LLC under its FERC blanket certificate (Docket No. CP24-515-000) requesting authorization to increase the maximum allowable operating pressure (MAOP) of its L-722 transmission pipeline in Lorain County, Ohio from 100 psig to 125 psig. The pressure increase would raise the pipeline's design capacity from 3,450 Dth/d to 4,500 Dth/d. FERC is the lead agency. No environmental impact analysis appears in this notice; the deadline for protests, interventions, and comments is November 4, 2024.123