BOEM announces the availability of a Record of Decision (ROD) based on the final programmatic EIS for wind energy development in six lease areas of the New York Bight. The ROD selects Sub-alternative C1, identification of AMMM measures at the programmatic stage using previously applied measures, as the preferred alternative. It identifies 58 AMMM measures that BOEM will apply as conditions of approval for construction and operations plans submitted by the six NY Bight lessees. This ROD concludes the programmatic NEPA process; project-specific analyses will tier from or incorporate the PEIS by reference.12