FERC staff has prepared an environmental assessment (EA) for the Parks Line Upgrade and Sorrento Station Project proposed by Gulf South Pipeline Company, LLC in St. Martin and Ascension Parishes, Louisiana. The project involves replacing 4.55 miles of existing pipeline to restore maximum allowable operating pressure (MAOP) of 1,000 psi on the Parks Line (Index 330), constructing a new Sorrento Compressor Station with a 12,510 horsepower gas-fired compressor unit, and installing approximately 1.35 miles of new discharge and connecting pipelines. The EA concludes approval would not constitute a major federal action significantly affecting the quality of the human environment. Comments are due October 6, 2025.12