This is an EPA weekly Notice of Availability listing a Revised Draft EIS (EIS No. 20250093) prepared by the U.S. Army Corps of Engineers for the Pearl River Basin Mississippi Federal Flood Risk Management Project in Mississippi. The notice sets a public comment deadline of August 18, 2025. No substantive impact analysis, alternatives, or mitigations are contained in this notice; those are in the underlying Revised Draft EIS.12