FERC has prepared an Environmental Assessment (EA) for Pine Prairie Energy Center, LLC's Phase IV Expansion Project at an existing natural gas storage facility in Evangeline Parish, Louisiana (Docket No. CP25-533-000). The project proposes a new storage cavern (Cavern No. 6), 0.16 miles of interconnecting pipelines, new compression and dehydration equipment, and about 2.4 miles of 30-inch header loop pipeline, with a target total storage capacity of 87.2 billion cubic feet. The EA concludes the project would not constitute a major federal action significantly affecting the quality of the human environment. Comments are due by February 23, 2026.12