FERC has issued a Notice of Availability for the Environmental Assessment (EA) of Rover Pipeline LLC's proposed Rover-Bulger Compressor Station and Harmon Creek Meter Station Expansion Project (Docket No. CP25-12-000). The project adds a 2,750 horsepower compressor unit, a discharge filter separator, an ultrasonic meter skid, a flow control skid, a filter separator, a unit blowdown silencer, and associated interconnect piping. FERC staff concludes approval would not constitute a major federal action significantly affecting the quality of the human environment. Public comments are due by July 25, 2025.12