FERC staff has prepared an Environmental Assessment (EA) for the Texas Connector Amendment Project, proposed by Texas Connector Pipeline LLC in Jefferson and Orange Counties, Texas. The amendment modifies the previously authorized Texas Connector Project by eliminating the Southern Compressor Station, shortening the southern pipeline segment from 7.6 to 1.4 miles, expanding the Orangefield Compressor Station from 40 to 82.4 acres with increased compression capacity, lengthening the northern pipeline segment from 26.6 to 29.6 miles, and proposing dredging of Big Hill Bayou for water access. Comments are due by April 21, 2025.123