FERC has issued a Notice of Availability for the Draft EIS for the Kosciusko Junction Pipeline Project in Mississippi (Docket Nos. CP25-547, CP25-549), with applicants Gulf South Pipeline Company, LLC and Texas Gas Transmission, LLC. The project involves Texas Gas abandoning by sale the existing Greenville Lateral and Isola Compressor Station to Gulf South, installing a new 24,160 hp compressor unit at the Greenville CS, and Gulf South constructing a 102.9-mile 36-inch KJ Pipeline, an 8.1-mile Columbia Gulf Lateral, two new compressor stations, and four meter stations. The EIS concludes impacts would be less than significant with mitigation. Comments are due May 25, 2026.123