1,595 federal NEPA projects, merged from 2,247 source documents. Refreshed every six hours.
| Date | Agency | St. | Project | Status | |
|---|---|---|---|---|---|
| Apr 16 | USFS | n/a | Dell Creek Forest Park Elk Feedgrounds project | STUB | stub |
| Apr 16 | BLM | n/a | Castle Mountain Mine project | STUB | stub |
| Apr 16 | USFS | n/a | High Uintas Wilderness Domestic Sheep Analysis project | STUB | stub |
| Apr 16 | FERC | WI | Weyauwega Hydroelectric Project No. 2550 energy | STUB | stub |
| Apr 16 | FERC | NC | Glencoe Mill Project No. 7404 Surrender of Exemption energy | STUB | stub |
| Apr 16 | MARAD | TX | ST LNG Deepwater Port Development Project energy | 2d | active |
| Apr 16 | USFS | MT | Pilgrim Creek Timber Sale Project public-lands | 2d | active |
| Apr 16 | OTHER | NM | Plutonium Pit Production Programmatic Environmental Impact Statement defense | 2d | active |
| Apr 16 | OTHER | AR | Expansion of the Foreign Military Sales F-35 Pilot Training Center at Ebbing Air National Guard Base defense | 2d | active |
| Apr 16 | USFS | CA | Mokelumne Amador Calaveras Forest Resilience Project public-lands | 2d | active |
| Apr 16 | OTHER | n/a | other | 18d · 2c | active |
| Apr 16 | EPA | MN | Environmental Impact Statements; Notice of Availability (Weekly Receipt April 28 – May 5, 2025) other | 41d · 36c | active |
| Apr 15 | DOE | n/a | BPA Project Reviews project | STUB | stub |
| Apr 15 | DOE | n/a | EIS-0026-SA-09: Supplement Analysis project | 68d | active |
| Apr 15 | FRA | n/a | Port Authority Trans-Hudson Positive Train Control Safety Plan Amendment transportation | 4d · 1c | active |
| Apr 14 | NRC | NM | National Enrichment Facility Transportation Package Exemption nuclear | STUB | stub |
| Apr 14 | FERC | IL | Ameren–EMRT Big Hollow Project energy | 2d | active |
| Apr 13 | EPA | n/a | HHCB and Phthalic Anhydride Draft Risk Evaluations other | STUB | stub |
| Apr 13 | OTHER | AK | Proposed Mortar and Artillery Training at Richardson Training Area, Joint Base Elmendorf-Richardson defense | 2d | active |
| Apr 12 | FERC | KS | Viola Project energy | STUB | stub |
| Apr 12 | FERC | VA | Bath County Pumped Storage Project energy | STUB | stub |
| Apr 9 | NRC | n/a | Construction Permit at the Clinch River Nuclear Site, Final Report project | STUB | stub |
| Apr 9 | OTHER | n/a | Upper Maple River Watershed Plan, North Dakota project | STUB | stub |
| Apr 9 | OTHER | n/a | The Clarke County Water Supply Project project | STUB | stub |
| Apr 9 | OTHER | n/a | Basing F-35A Lightning II Formal Training Unit at Kingsley Field Air National Guard Base Klamath Falls, Oregon project | STUB | stub |
| Apr 9 | FERC | n/a | Gulf South Pipeline Company, LLC et al. re the Kosciusko Junction Pipeline Project project | STUB | stub |
| Apr 9 | FERC | n/a | Sabine Pass Stage 5 Expansion Project project | STUB | stub |
| Apr 9 | OTHER | n/a | Environmental Technologies Trade Advisory Committee Meeting other | STUB | stub |
| Apr 9 | EPA | n/a | Weekly Receipt of Environmental Impact Statements (EIS) – Notice of Availability other | 2d | active |
| Apr 8 | FERC | MS | Line 31 Expansion Project energy | STUB | stub |
| Apr 7 | OTHER | AL | Spring Valley II Solar Project energy | 2d | active |
| Apr 7 | FERC | LA | Sabine Pass Stage 5 Expansion Project energy | 2d | active |
| Apr 6 | OTHER | n/a | Carbon and Alloy Steel Wire Rod From the Republic of Korea: Final Results of Antidumping Duty Administrative Review; 2023–2024 other | STUB | stub |
| Apr 5 | OTHER | n/a | Nuclear Fuel Data Survey Form GC-859 other | STUB | stub |
| Apr 5 | FERC | MS | Kosciusko Junction Pipeline Project energy | STUB | stub |
| Apr 5 | OTHER | TN | Clinch River Nuclear Site Advanced Nuclear Reactor Technology Park Unit 1 nuclear | 5d | active |
| Apr 1 | NRC | GA | Edwin I. Hatch Nuclear Plant, Units 1 and 2 Subsequent License Renewal nuclear | STUB | stub |
| Mar 31 | BLM | MT | Bridger Pipeline Expansion Project energy | STUB | stub |
| Mar 26 | NRC | KY | Paducah Laser Enrichment Facility nuclear | 3d · 29c | active |
| Mar 26 | OTHER | NM | Draft Site-Wide Environmental Impact Statement for Continued Operation of the Los Alamos National Laboratory defense | 3d | active |
| Mar 24 | OTHER | NE | Lower Wood River Watershed Floodwater Reduction Project water | STUB | stub |
| Mar 24 | NPS | DC | Redevelopment at the Robert F. Kennedy Memorial Stadium Campus infrastructure | STUB | stub |
| Mar 19 | NRC | TX | Project Matador Nuclear Units 1–4 nuclear | 2d · 12c | active |
| Mar 19 | EPA | UT | EPA Weekly EIS Notice of Availability (Filed August 4–11, 2025) other | 5d | active |
| Mar 18 | FERC | MN | Rapidan Hydroelectric Project Surrender of Exemption energy | STUB | stub |
| Mar 17 | OTHER | NY | Fulton Park Redevelopment Project infrastructure | STUB | stub |
| Mar 17 | FERC | NV | Gabbs Lateral NASF Relocation Project energy | 2d | active |
| Mar 15 | NRC | WY | Kemmerer Power Station Unit 1 nuclear | 5d | active |
| Mar 12 | OTHER | n/a | Supplemental Environmental Impact Statement for Improving Homeport Facilities for Three NIMITZ-Class Aircraft Carriers in Support of the U.S. Pacific Fleet defense | STUB | stub |
| Mar 11 | FERC | AR | Texas-Arkansas Power Project energy | STUB | stub |