1,595 federal NEPA projects, merged from 2,247 source documents. Refreshed every six hours.
| Date | Agency | St. | Project | Status | |
|---|---|---|---|---|---|
| Nov 27 | NRC | WI | SHINE Medical Isotope Production Facility nuclear | STUB | stub |
| Nov 25 | OTHER | n/a | Administrative Rulings other | STUB | stub |
| Nov 24 | FERC | KY | Danville Compressor Station Replacement Project energy | 2d | active |
| Nov 24 | FWS | CA | California Department of Water Resources Sutter and Sacramento Maintenance Yards Habitat Conservation Plan for Eight Elderberry Management Zones other | 1c | stub |
| Nov 24 | FERC | VA | Southeast Supply Enhancement Project energy | 2d | active |
| Nov 23 | FERC | CA | South SWP Temporary Variance for Increased Water Deliveries from Pyramid Lake to Lake Piru water | STUB | stub |
| Nov 20 | FERC | MN | Rapidan Dam Hydroelectric Project energy | 2d | active |
| Nov 19 | DOE | n/a | DOE/EIS-0359-S1 and DOE/EIS-0360-S1: Notice of Intent project | 6d | active |
| Nov 18 | USCG | n/a | Atlantic Fleet Training and Testing Final Supplemental Environmental Impact Statement/Overseas Environmental Impact Statement defense | 3d · 2c | active |
| Nov 18 | EPA | n/a | 1,1-Dichloroethane Risk Evaluation other | 2d · 62c | active |
| Nov 17 | OTHER | n/a | Fatality Analysis Reporting System (FARS) and Non-Traffic Surveillance (NTS) other | STUB | stub |
| Nov 17 | OTHER | NM | Site-Wide Environmental Impact Statement for Continued Operation of Sandia National Laboratories, New Mexico and Supplemental Environmental Impact Statement for Enhanced Plutonium Facility Utilization at Lawrence Livermore National Laboratory defense | STUB | stub |
| Nov 17 | OTHER | n/a | Non-NEPA Federal Register Notices (HHS/FDA/IHS/NIH) other | 2d | active |
| Nov 13 | USACE | TX | Matagorda Ship Channel Improvement Project water | STUB | stub |
| Nov 11 | FTA | n/a | Capital Investment Grants Program Final Policy Guidance other | STUB | stub |
| Oct 21 | DOE | n/a | DOE/EIS-0391: Amended Record of Decision for 200 West Area Tank Waste Treatment (October 2025) project | STUB | stub |
| Oct 19 | BLM | CA | Castle Mountain Mine Phase II Expansion mining | STUB | stub |
| Oct 1 | BLM | WY | Rock Springs Field Office Resource Management Plan public-lands | 5d | active |
| Sep 30 | FERC | WY | Seminoe Pumped Storage Project energy | 2d | active |
| Sep 30 | NRC | WI | Point Beach Nuclear Plant, Units 1 and 2 Subsequent License Renewal Supplemental Environmental Impact Statement nuclear | 4d | active |
| Sep 29 | USGS | WI | Updated Facility for the National Wildlife Health Center infrastructure | STUB | stub |
| Sep 28 | OTHER | n/a | HOLON Temporary Exemption from Federal Motor Vehicle Safety Standards other | STUB | stub |
| Sep 28 | NRC | FL | Crystal River Nuclear Power Station, Unit 3 Partial Site Release nuclear | STUB | stub |
| Sep 28 | NRC | AZ | Disa Technologies, Inc. High-Pressure Slurry Ablation Technology for Abandoned Uranium Mine Remediation nuclear | 2d | active |
| Sep 25 | FERC | NV | Desert Bloom Energy Storage Project energy | STUB | stub |
| Sep 24 | OTHER | n/a | Hazardous Conditions Complaints other | STUB | stub |
| Sep 24 | FERC | OK | Cedar Vale Compressor Station Project energy | 2d | active |
| Sep 22 | FWS | AK | Cruise Ship Passenger Dock and Terminal Facility in Seward, AK infrastructure | STUB | stub |
| Sep 22 | FAA | TX | Tiered Environmental Assessment for Updates to Airspace Closures for the Flight 9 Mission Profile of the SpaceX Starship-Super Heavy Vehicle at the SpaceX Boca Chica Launch Site transportation | 2d | active |
| Sep 18 | FERC | n/a | Qualifying Facility Rates and Requirements Implementation Issues Under the Public Utility Regulatory Policies Act of 1978 energy | 4d | active |
| Sep 17 | FERC | CA | Kerckhoff Hydroelectric Project No. 96 energy | 3d | active |
| Sep 16 | FERC | CA | Anderson Dam Project energy | STUB | stub |
| Sep 16 | FERC | TX | Supply Lateral Project energy | 2d | active |
| Sep 14 | FERC | NH | Squam Lake Dam Hydroelectric Project Exemption Surrender energy | STUB | stub |
| Sep 14 | BOR | AZ | GSC Farm–Queen Creek Water Transfer Project water | STUB | stub |
| Sep 11 | FERC | CO | Georgetown Project No. 2187 Stream Bypass Pipeline energy | STUB | stub |
| Sep 11 | FRA | NY | Long Island Rail Road Positive Train Control Safety Plan Amendment transportation | 4d | active |
| Sep 11 | BLM | AL | Warrior Met Coal Mines Federal Coal Lease Applications mining | 3d | active |
| Sep 10 | FERC | SC | Parr Hydroelectric Project No. 1894 Turbine Venting Variance energy | STUB | stub |
| Sep 10 | FERC | NY | Lake Algonquin Hydroelectric Project energy | STUB | stub |
| Sep 9 | FERC | LA | Parks Line Upgrade and Sorrento Station Project energy | 2d | active |
| Sep 8 | OTHER | n/a | Notice of Appeal From a Decision of an Immigration Judge (Form EOIR-26) other | STUB | stub |
| Sep 8 | USACE | TX | Sabine Pass to Galveston Bay Coastal Storm Risk Management and Ecosystem Restoration Project, Orange County water | STUB | stub |
| Sep 8 | OTHER | n/a | Enhanced Integrated Air and Missile Defense System on Guam defense | 3d | active |
| Sep 4 | OTHER | OR | Marine Mammals; Pinniped Removal Authority; Approval of Application (Columbia River Basin Sea Lion Lethal Removal) other | STUB | stub |
| Sep 4 | BLM | NV | Silver Peak Lithium Mine Amendment to Plan of Operations Project mining | 2d | active |
| Sep 2 | BOR | CA | North-to-South Water Transfers water | STUB | stub |
| Sep 2 | FAA | FL | SpaceX Falcon 9 Operations at Space Launch Complex 40 (SLC-40) transportation | 2d | active |
| Aug 28 | USFS | AK | Roadless Area Conservation Rule Rescission public-lands | STUB | stub |
| Aug 27 | FERC | NE | Loup River Hydroelectric Project No. 1256 License Amendment energy | STUB | stub |