1,595 federal NEPA projects, merged from 2,247 source documents. Refreshed every six hours.
| Date | Agency | St. | Project | Status | |
|---|---|---|---|---|---|
| May 5 | FERC | ME | Lower Mousam Hydroelectric Project License Surrender energy | 2d | active |
| May 5 | FERC | NC | Keowee-Toxaway Hydroelectric Project energy | STUB | stub |
| May 5 | FERC | CA | South State Water Project Hydroelectric Project energy | STUB | stub |
| May 1 | FERC | VT | Gilman Hydroelectric Project energy | STUB | stub |
| May 1 | OTHER | TX | Bridge of the Americas Land Port of Entry Modernization infrastructure | 3d | active |
| May 1 | FERC | NY | Franklin Falls Hydroelectric Project energy | STUB | stub |
| May 1 | BLM | CA | Mojave Precious Metals Exploration Drilling Project mining | STUB | stub |
| Apr 30 | DOE | n/a | DOE/EIS-0562: Record of Decision; August 5, 2024 project | 4d | active |
| Apr 29 | OTHER | n/a | Non-NEPA Federal Register Notices (FEMA Information Collections) other | STUB | stub |
| Apr 28 | OTHER | n/a | Build-To-Suit Lease Program infrastructure | STUB | stub |
| Apr 27 | OTHER | n/a | Dairy Product Mandatory Reporting Program other | STUB | stub |
| Apr 27 | OTHER | AK | Sweetheart Lake Hydroelectric Project energy | STUB | stub |
| Apr 27 | USACE | IA | Lower Missouri River Flood Risk and Resiliency System Plan water | STUB | stub |
| Apr 24 | OTHER | n/a | Migrant Protection Protocols Program other | STUB | stub |
| Apr 23 | OTHER | WA | EA-18G Growler Airfield Operations at Naval Air Station Whidbey Island Complex defense | 2d | active |
| Apr 23 | FERC | LA | Black Bayou Gas Storage Project energy | 2d | active |
| Apr 23 | USACE | SC | South Carolina Highway 22 Extension Project transportation | STUB | stub |
| Apr 17 | OTHER | ID | Homeland Defense Over-The-Horizon Radar at Northwest Region defense | STUB | stub |
| Apr 17 | EPA | n/a | Community Grants Program Programmatic Environmental Assessment water | 2d | active |
| Apr 16 | FERC | WI | Heartland Project energy | STUB | stub |
| Apr 16 | OTHER | n/a | Sheffield Petition to Reopen and Set Aside Order other | STUB | stub |
| Apr 16 | EPA | n/a | Draft Sewage Sludge Risk Assessment for Perfluorooctanoic Acid (PFOA) and Perfluorooctane Sulfonic Acid (PFOS) other | 2d | active |
| Apr 14 | OTHER | MT | Grizzly Bear Damage Management in Montana other | STUB | stub |
| Apr 13 | FRA | n/a | Canadian Pacific Railway's Request To Amend Its Positive Train Control System transportation | STUB | stub |
| Apr 13 | FERC | LA | Red River Lock & Dam #4 and #5 Hydroelectric Projects energy | STUB | stub |
| Apr 9 | FERC | n/a | EcoEléctrica Liquefied Natural Gas (LNG) Supply Pipeline Capacity Project energy | 2d | active |
| Apr 8 | FERC | CA | Battle Creek Hydroelectric Project License Amendment – Phase 2 Battle Creek Salmon and Steelhead Restoration Project energy | 2d | active |
| Apr 7 | OTHER | n/a | Non-NEPA Document other | STUB | stub |
| Apr 6 | FERC | NY | Crescent Hydroelectric Project Relicense energy | STUB | stub |
| Apr 3 | NRC | SC | Site-Specific Environmental Impact Statement for Subsequent License Renewal of Oconee Nuclear Station, Units 1, 2, and 3 Second Renewal nuclear | 2d | active |
| Apr 3 | FERC | AL | R.L. Harris Hydroelectric Project energy | 2d | active |
| Apr 3 | FERC | TX | Texas LNG Project energy | 2d | active |
| Apr 2 | DOE | n/a | Tribal Energy Access, Southwestern Grid Connector, and Lake Erie-Canada National Interest Electric Transmission Corridors energy | STUB | stub |
| Apr 1 | BLM | ND | Freedom Mine Company Proposed Emergency Federal Coal Lease-by-Application and Mining Plan Modification mining | STUB | stub |
| Mar 30 | OTHER | UT | EnCap Investments L.P. et al. Petition to Reopen and Modify Order energy | STUB | stub |
| Mar 27 | FERC | TX | Texas Connector Amendment Project energy | 2d | active |
| Mar 27 | FERC | NC | Spencer Mountain Hydroelectric Project energy | 2d | active |
| Mar 26 | OTHER | IL | Sugar Camp Energy, LLC Mine No. 1 Significant Boundary Revision 8 mining | 2d | active |
| Mar 20 | EPA | TX | Environmental Impact Statements; Notice of Availability (Weekly Receipt: Green Eagle Railroad; Grand Targhee Master Development Plan Projects) other | STUB | stub |
| Mar 19 | OTHER | FL | Expansion of Childcare Services North of the Eglin Test and Training Complex defense | STUB | stub |
| Mar 18 | USACE | CA | San Clemente Shoreline Protection Project water | 2d | active |
| Mar 13 | FERC | CA | Santa Felicia Dam Safety Improvement Project energy | STUB | stub |
| Mar 11 | FERC | ID | Idaho Falls Hydroelectric Project Temporary Variance energy | STUB | stub |
| Mar 10 | FERC | WV | Lake Lynn Hydroelectric Project No. 2459 Relicense energy | STUB | stub |
| Mar 10 | NRC | NY | Nine Mile Point Nuclear Station Units 1 and 2 Independent Spent Fuel Storage Installation nuclear | 2d | active |
| Mar 6 | FERC | ME | Shawmut Hydroelectric Project, Weston Hydroelectric Project, Hydro-Kennebec Hydroelectric Project, and Lockwood Hydroelectric Project energy | STUB | stub |
| Mar 5 | NRC | PA | Peach Bottom Atomic Power Station Units 2 and 3 Independent Spent Fuel Storage Installation Exemption nuclear | STUB | stub |
| Mar 4 | EPA | n/a | Vinyl Chloride Risk Evaluation other | 2d | active |
| Mar 3 | FERC | IL | Rockton Hydroelectric Project No. 2373 energy | 2d | active |
| Mar 3 | FERC | WI | Beloit Hydroelectric Project energy | STUB | stub |